


Commercial plot 2.59 ha, Serock
Can I buy this plot?
Commercial land in Serock, Serock municipality, mazowieckie province. The area is close to a lake. A decision on building conditions has been issued. Utilities available: water, sewage, fibre. Access by asphalt road, frontage about 115 m.
Description generated from the listing data. Original in Polish.
A decision on building conditions has been issued: <b>housing</b>. It can be transferred to the buyer.
Identity confirmed through the seller's bank (mojeID) and matched with the land register. Checked on .
Check the flood hazard map (map layer).
Example. In the full version every plot is checked automatically against the maps of Wody Polskie, the Polish Geological Institute, GDOŚ and the heritage register. Information from public maps, not a guarantee.
Goal: Warehouse, commercial building · 3 to check, 0 need attention, 3 done
Before you buy
- Check the land registerDone
We checked this for you: the owner matches the register.
- 2Check what you may buildCheck first
Building conditions exist. Check they are valid and can be transferred to you.
An extract from the local zoning plan at the council office: what, how high and how much you may build.
A small fee at the council, or ask the seller
Where to check: - Check access to a public roadDone
Public road, asphalt.
- 4Check hazards and restrictionsCheck first
Applies to this plot: water in the area.
See on the map whether the plot is in a zone. Each restriction is explained in the box “Hazards and restrictions”.
Free, you can check it online yourself
Where to check:Wody Polskie flood portalsite in Polish - 5Soil surveyTo do
Boreholes show if the ground is stable and how deep the water is. Foundation costs depend on it.
Paid and optional. Worth doing before signing, especially for a pricier plot
- 6Sign the deed at a notaryTo do
First a preliminary contract with conditions (e.g. getting WZ), then the notarial deed. See the cost calculator.
Useful:
Design and permits
- 7Environmental decisionTo do
Many halls, warehouses and plants need an environmental decision before the building permit, depending on size and use.
- 8Survey map for the designTo do
A surveyor prepares an up-to-date map with utilities. The architect draws the house on it.
- 9Building design and approvalsTo do
A design approved by fire, sanitary and health and safety experts.
- 10Road access permitTo do
Consent of the road authority for an entrance, often with a design when lorries will use it.
Utilities
- 11ElectricityCheck first
Network nearby (150 m). Ask about cost and time of a longer connection.
Useful:Usually in this region: PGE Dystrybucja (w Warszawie Stoen Operator). You can apply for connection conditions online on the operator's website. PGE Dystrybucja
- WaterDone
Already connected on the plot.
- 13SewageTo do
Sewer in the road: apply for a connection.
Useful:
Design and permits
- 14Building permitTo do
Application with the design and approvals. The office has 65 days.
Construction
- 15ShellTo do
Electronic site log, site manager, foundations, walls, roof.
- 16Installations and finishingTo do
Windows, installations, heat pump or boiler, solar panels, plaster, floors.
Completion
- 17Inspections and occupancy permitTo do
Fire brigade and sanitary inspections, then the occupancy permit.
Draft to be reviewed by an architect and a lawyer. Costs and times are approximate.
The pin shows the approximate location of this sample listing.
Similar plots nearby
Illustrative photo
Illustrative photo
Illustrative photo