← Plotslubelskie / Lublin / Lublin

Building plot 1,260 m², Lublin

Lublin, Lublin, Lublin, lubelskie · listed 35 days ago
Price€73,216
Size1,260 m²
Price per m²€58
ZoningZoning: single-family housing

Can I buy this plot?

I am a citizen of:

Building land in Lublin, Lublin municipality, lubelskie province. Covered by a local zoning plan (MN: single-family housing). Utilities available: electricity, water, sewage. Access by paved road, frontage about 28 m.

Description generated from the listing data. Original in Polish.

Size1,260 m²
TypeBuilding
Frontageapprox. 28 m
Shaperectangle
Terrainflat
Fencedyes
Roadpublic
Can be dividedno
Plot number751/22 (sample)
MunicipalityLublin
To the city centreLublin, 1 km
To the airport10 km

seller's declaration
StatusLocal zoning plan (MPZP)
Permitted useMN (single-family housing)
Max. building coverage40%
Min. green area50%
Max. building height9.5 m

seller's declaration
Electricityin the road
Wateron the plot
Sewageon the plot
Gasnearby, approx. 50 m
Fibrenearby, approx. 150 m
Road accesspaved road

Owner not verified

The plot has a land register entry. Ask the seller for its number and check it for free in the national EKW system.

We see no restrictions in this plot's sample data.

Example. In the full version every plot is checked automatically against the maps of Wody Polskie, the Polish Geological Institute, GDOŚ and the heritage register. Information from public maps, not a guarantee.

Goal: Family house · 2 to check, 0 need attention, 3 done

Ticked: 0 of 14

Before you buy

  1. 1
    Check the land registerCheck first

    The owner is not verified yet. Check the register before paying a deposit.

    Who owns it, any mortgages, rights of way or claims.

    Free, you can check it online yourself

    Enter the register number from the listing. Mortgages are in section IV, rights of way and restrictions in section III.

    Time: a few minutesCost: free
  2. 2
    Check what you may buildCheck first

    The seller states zoning MN. Confirm with an extract from the council.

    An extract from the local zoning plan at the council office: what, how high and how much you may build.

    A small fee at the council, or ask the seller

    Where to check:
    Who helps: ArchitectTime: 1-2 weeksCost: about €10-60
  3. Check access to a public roadDone

    Public road, paved.

  4. 4
    Soil surveyTo do

    Boreholes show if the ground is stable and how deep the water is. Foundation costs depend on it.

    Paid and optional. Worth doing before signing, especially for a pricier plot

    Who helps: Soil engineerTime: 1-2 weeksCost: about PLN 1,500-3,000
  5. 5
    Sign the deed at a notaryTo do

    First a preliminary contract with conditions (e.g. getting WZ), then the notarial deed. See the cost calculator.

    Useful:
    Who helps: Notary, mortgage brokerTime: 2-6 weeksCost: see calculator

Design and permits

  1. 6
    Construction mortgageTo do

    The bank pays out in stages as the build progresses.

    Useful:
    Who helps: Mortgage brokerTime: 1-2 monthsCost: broker usually paid by the bank
  2. 7
    Survey map for the designTo do

    A surveyor prepares an up-to-date map with utilities. The architect draws the house on it.

    Who helps: SurveyorTime: 2-6 weeksCost: about PLN 1,500-3,000
  3. 8
    House designTo do

    A catalogue design adapted to the plot, or a bespoke one.

    Who helps: ArchitectTime: 1-4 monthsCost: about PLN 8-40k

Utilities

  1. 9
    ElectricityTo do

    Power in the road: apply to the grid operator.

    Useful:

    Usually in this region: PGE Dystrybucja. You can apply for connection conditions online on the operator's website. PGE Dystrybucja

    Who helps: ElectricianTime: 2-12 monthsCost: about PLN 2-5k
  2. WaterDone

    Already connected on the plot.

  3. SewageDone

    Already connected on the plot.

  4. 12
    HeatingTo do

    No gas: usually a heat pump, often with solar panels.

    Who helps: Installer

Design and permits

  1. 13
    Building permit or notificationTo do

    A house up to 70 m² footprint needs only a notification; a larger one needs a permit. The office has 65 days.

    Who helps: Architect, site managerTime: 1-3 monthsCost: usually free for a house

Construction

  1. 14
    ShellTo do

    Electronic site log, site manager, foundations, walls, roof.

    Who helps: Builder, site managerTime: 4-8 monthsCost: the largest part of the budget
  2. 15
    Installations and finishingTo do

    Windows, installations, heat pump or boiler, solar panels, plaster, floors.

    Who helps: Installers, finishersTime: 3-9 monthsCost: depends on the finish
  3. 16
    Fence, driveway, gardenTo do
    Who helps: Paver, gardenerTime: 1-2 monthsCost: from a few thousand PLN

Completion

  1. 17
    CompletionTo do

    Notice of completion, utility acceptance, a street number, and registering the building.

    Who helps: Site manager, surveyorTime: 1-2 monthsCost: as-built survey about PLN 1-2k

Draft to be reviewed by an architect and a lawyer. Costs and times are approximate.

The pin shows the approximate location of this sample listing.

Similar plots nearby

€73,216
1,260 m² · €58/m²