


Building plot 1,150 m², Łęczna
Can I buy this plot?
Building land in Łęczna, Łęczna municipality, lubelskie province. Covered by a local zoning plan (MN: single-family housing). Utilities available: electricity, water. Access by asphalt road, frontage about 25 m.
Description generated from the listing data. Original in Polish.
Identity confirmed through the seller's bank (mojeID) and matched with the land register. Checked on .
We see no restrictions in this plot's sample data.
Example. In the full version every plot is checked automatically against the maps of Wody Polskie, the Polish Geological Institute, GDOŚ and the heritage register. Information from public maps, not a guarantee.
Goal: Family house · 0 to check, 1 need attention, 5 done
Before you buy
- Check the land registerDone
We checked this for you: the owner matches the register.
- Check what you may buildDone
We checked this for you: zoning plan MN.
- Check access to a public roadDone
Public road, asphalt.
- 4Soil surveyTo do
Boreholes show if the ground is stable and how deep the water is. Foundation costs depend on it.
Paid and optional. Worth doing before signing, especially for a pricier plot
- 5Sign the deed at a notaryTo do
First a preliminary contract with conditions (e.g. getting WZ), then the notarial deed. See the cost calculator.
Useful:
Design and permits
- 6Construction mortgageTo do
The bank pays out in stages as the build progresses.
Useful: - 7Survey map for the designTo do
A surveyor prepares an up-to-date map with utilities. The architect draws the house on it.
- 8House designTo do
A catalogue design adapted to the plot, or a bespoke one.
Utilities
- ElectricityDone
Already connected on the plot.
- WaterDone
Already connected on the plot.
- 11SewageAttention
No sewer: a septic tank or small treatment plant.
Useful: - 12HeatingTo do
No gas: usually a heat pump, often with solar panels.
Design and permits
- 13Building permit or notificationTo do
A house up to 70 m² footprint needs only a notification; a larger one needs a permit. The office has 65 days.
Construction
- 14ShellTo do
Electronic site log, site manager, foundations, walls, roof.
- 15Installations and finishingTo do
Windows, installations, heat pump or boiler, solar panels, plaster, floors.
- 16Fence, driveway, gardenTo do
Completion
- 17CompletionTo do
Notice of completion, utility acceptance, a street number, and registering the building.
Draft to be reviewed by an architect and a lawyer. Costs and times are approximate.
The pin shows the approximate location of this sample listing.
Similar plots nearby
Illustrative photo
Illustrative photo
Illustrative photo