


Building plot 1,080 m², Łęczna
Can I buy this plot?
Description
Building land in Łęczna, Łęczna municipality, lubelskie province. Covered by a local zoning plan (MN: single-family housing). Utilities available: sewage, fibre. Access by paved road, frontage about 31 m.
Description generated from the listing data. Original in Polish.
Plot details
Zoning and building we checked this for you
Utilities and access we checked this for you
Legal status
Identity confirmed through the seller's bank (mojeID) and matched with the land register. Checked on .
Hazards and restrictions
Check the landslide map of the Polish Geological Institute and do a soil survey before buying.
Example. In the full version every plot is checked automatically against the maps of Wody Polskie, the Polish Geological Institute, GDOŚ and the heritage register. Information from public maps, not a guarantee.
What next with this plot?
Goal: Family house · 1 to check, 2 need attention, 3 done
Before you buy
- Check the land registerDone
We checked this for you: the owner matches the register.
- Check what you may buildDone
We checked this for you: zoning plan MN.
- Check access to a public roadDone
Public road, paved.
- 4Check hazards and restrictionsCheck first
Applies to this plot: sloping or mountain land.
See on the map whether the plot is in a zone. Each restriction is explained in the box “Hazards and restrictions”.
Free, you can check it online yourself
Where to check:Wody Polskie flood portalsite in Polish - 5Soil surveyTo do
Sloping plot: the soil survey matters even more here.
Boreholes show if the ground is stable and how deep the water is. Foundation costs depend on it.
Paid and optional. Worth doing before signing, especially for a pricier plot
- 6Sign the deed at a notaryTo do
First a preliminary contract with conditions (e.g. getting WZ), then the notarial deed. See the cost calculator.
Useful:
Design and permits
- 7Construction mortgageTo do
The bank pays out in stages as the build progresses.
Useful: - 8Survey map for the designTo do
A surveyor prepares an up-to-date map with utilities. The architect draws the house on it.
- 9House designTo do
A catalogue design adapted to the plot, or a bespoke one.
Utilities
- 10ElectricityAttention
No grid nearby. Ask the operator about extending it; it can take long.
Useful:Usually in this region: PGE Dystrybucja. You can apply for connection conditions online on the operator's website. PGE Dystrybucja
- 11WaterAttention
No water main: you will need a well.
Useful: - 12SewageTo do
Sewer in the road: apply for a connection.
Useful: - 13HeatingTo do
No gas: usually a heat pump, often with solar panels.
Design and permits
- 14Building permit or notificationTo do
A house up to 70 m² footprint needs only a notification; a larger one needs a permit. The office has 65 days.
Construction
- 15ShellTo do
Electronic site log, site manager, foundations, walls, roof.
- 16Installations and finishingTo do
Windows, installations, heat pump or boiler, solar panels, plaster, floors.
- 17Fence, driveway, gardenTo do
Completion
- 18CompletionTo do
Notice of completion, utility acceptance, a street number, and registering the building.
Draft to be reviewed by an architect and a lawyer. Costs and times are approximate.
Location
The pin shows the approximate location of this sample listing.
Similar plots nearby
Illustrative photo
Illustrative photo
Illustrative photo