


Commercial plot 2.39 ha, Siechnice
Can I buy this plot?
Commercial land in Siechnice, Siechnice municipality, dolnośląskie province. Covered by a local zoning plan (U: services). Utilities available: electricity, water, gas, fibre. Access by asphalt road, frontage about 120 m.
Description generated from the listing data. Original in Polish.
The plot has a land register entry. Ask the seller for its number and check it for free in the national EKW system.
We see no restrictions in this plot's sample data.
Example. In the full version every plot is checked automatically against the maps of Wody Polskie, the Polish Geological Institute, GDOŚ and the heritage register. Information from public maps, not a guarantee.
Goal: Warehouse, commercial building · 2 to check, 1 need attention, 2 done
Before you buy
- 1Check the land registerCheck first
The owner is not verified yet. Check the register before paying a deposit.
Who owns it, any mortgages, rights of way or claims.
Free, you can check it online yourself
Where to check:Land register searchsite in PolishEnter the register number from the listing. Mortgages are in section IV, rights of way and restrictions in section III.
- 2Check what you may buildCheck first
The seller states zoning U. Confirm with an extract from the council.
An extract from the local zoning plan at the council office: what, how high and how much you may build.
A small fee at the council, or ask the seller
Where to check: - Check access to a public roadDone
Public road, asphalt.
- 4Soil surveyTo do
Boreholes show if the ground is stable and how deep the water is. Foundation costs depend on it.
Paid and optional. Worth doing before signing, especially for a pricier plot
- 5Sign the deed at a notaryTo do
First a preliminary contract with conditions (e.g. getting WZ), then the notarial deed. See the cost calculator.
Useful:
Design and permits
- 6Environmental decisionTo do
Many halls, warehouses and plants need an environmental decision before the building permit, depending on size and use.
- 7Survey map for the designTo do
A surveyor prepares an up-to-date map with utilities. The architect draws the house on it.
- 8Building design and approvalsTo do
A design approved by fire, sanitary and health and safety experts.
- 9Road access permitTo do
Consent of the road authority for an entrance, often with a design when lorries will use it.
Utilities
- ElectricityDone
Already connected on the plot.
- 11WaterTo do
Water main in the road: apply to the water company.
Useful: - 12SewageAttention
No sewer: a septic tank or small treatment plant.
Useful:
Design and permits
- 13Building permitTo do
Application with the design and approvals. The office has 65 days.
Construction
- 14ShellTo do
Electronic site log, site manager, foundations, walls, roof.
- 15Installations and finishingTo do
Windows, installations, heat pump or boiler, solar panels, plaster, floors.
Completion
- 16Inspections and occupancy permitTo do
Fire brigade and sanitary inspections, then the occupancy permit.
Draft to be reviewed by an architect and a lawyer. Costs and times are approximate.
The pin shows the approximate location of this sample listing.
Similar plots nearby
Illustrative photo
Illustrative photo
Illustrative photo