← Plotspomorskie / wejherowski / Rumia

Commercial plot 1.49 ha, Rumia

Rumia, Rumia, wejherowski, pomorskie · listed 22 days ago
Price€960,966
Size1.49 ha
Price per m²€64
ZoningZoning: industry and services

Can I buy this plot?

I am a citizen of:

Description

Commercial land in Rumia, Rumia municipality, pomorskie province. Covered by a local zoning plan (P/U: industry and services). Utilities available: water, sewage, gas, fibre. Access by paved road, frontage about 96 m.

Description generated from the listing data. Original in Polish.

Plot details

Size1.49 ha
TypeCommercial
Frontageapprox. 96 m
Shapetrapezoid
Terrainflat
Fencedno
Roadpublic
Can be dividedno
Plot number320/20 (sample)
MunicipalityRumia
To the city centreGdańsk & Tricity, 27 km
To the airport20 km

Zoning and building we checked this for you

StatusLocal zoning plan (MPZP)
Permitted useP/U (industry and services)
Max. building coverage70%
Min. green area20%
Max. building height15 m

Utilities and access we checked this for you

Electricitynearby, approx. 120 m
Waterin the road
Sewagein the road
Gasin the road
Fibrein the road
Road accesspaved road

Legal status

Verified owner

Identity confirmed through the seller's bank (mojeID) and matched with the land register. Checked on .

Hazards and restrictions

We see no restrictions in this plot's sample data.

Example. In the full version every plot is checked automatically against the maps of Wody Polskie, the Polish Geological Institute, GDOŚ and the heritage register. Information from public maps, not a guarantee.

What next with this plot?

Goal: Warehouse, commercial building · 1 to check, 0 need attention, 3 done

Ticked: 0 of 13

Before you buy

  1. Check the land registerDone

    We checked this for you: the owner matches the register.

  2. Check what you may buildDone

    We checked this for you: zoning plan P/U.

  3. Check access to a public roadDone

    Public road, paved.

  4. 4
    Soil surveyTo do

    Boreholes show if the ground is stable and how deep the water is. Foundation costs depend on it.

    Paid and optional. Worth doing before signing, especially for a pricier plot

    Who helps: Soil engineerTime: 1-2 weeksCost: about PLN 1,500-3,000
  5. 5
    Sign the deed at a notaryTo do

    First a preliminary contract with conditions (e.g. getting WZ), then the notarial deed. See the cost calculator.

    Useful:
    Who helps: Notary, mortgage brokerTime: 2-6 weeksCost: see calculator

Design and permits

  1. 6
    Environmental decisionTo do

    Many halls, warehouses and plants need an environmental decision before the building permit, depending on size and use.

    Who helps: Environmental consultantTime: 2-6 monthsCost: from a few thousand PLN
  2. 7
    Survey map for the designTo do

    A surveyor prepares an up-to-date map with utilities. The architect draws the house on it.

    Who helps: SurveyorTime: 2-6 weeksCost: about PLN 1,500-3,000
  3. 8
    Building design and approvalsTo do

    A design approved by fire, sanitary and health and safety experts.

    Who helps: Architect, fire safety expertTime: 2-6 monthsCost: from tens of thousands of PLN
  4. 9
    Road access permitTo do

    Consent of the road authority for an entrance, often with a design when lorries will use it.

    Who helps: Road designerTime: 1-2 monthsCost: from a few thousand PLN

Utilities

  1. 10
    ElectricityCheck first

    Network nearby (120 m). Ask about cost and time of a longer connection.

    Useful:

    Usually in this region: Energa Operator. You can apply for connection conditions online on the operator's website. Energa Operator

    Who helps: ElectricianTime: 2-12 monthsCost: about PLN 2-5k
  2. 11
    WaterTo do

    Water main in the road: apply to the water company.

    Useful:
    Who helps: Plumber, well drillerTime: 1-6 monthsCost: about PLN 3-20k
  3. 12
    SewageTo do

    Sewer in the road: apply for a connection.

    Useful:
    Who helps: PlumberTime: 1-6 monthsCost: about PLN 5-25k

Design and permits

  1. 13
    Building permitTo do

    Application with the design and approvals. The office has 65 days.

    Who helps: ArchitectTime: 2-3 monthsCost: stamp duty

Construction

  1. 14
    ShellTo do

    Electronic site log, site manager, foundations, walls, roof.

    Who helps: Builder, site managerTime: 4-8 monthsCost: the largest part of the budget
  2. 15
    Installations and finishingTo do

    Windows, installations, heat pump or boiler, solar panels, plaster, floors.

    Who helps: Installers, finishersTime: 3-9 monthsCost: depends on the finish

Completion

  1. 16
    Inspections and occupancy permitTo do

    Fire brigade and sanitary inspections, then the occupancy permit.

    Who helps: Site manager, expertsTime: 1-2 monthsCost: official fees

Draft to be reviewed by an architect and a lawyer. Costs and times are approximate.

Location

The pin shows the approximate location of this sample listing.

Similar plots nearby

€960,966
1.49 ha · €64/m²