


Mixed-use plot 6,900 m², Chmielno
Can I buy this plot?
Description
Mixed land in Chmielno, Chmielno municipality, pomorskie province. The area is close to a lake and forest. Covered by a local zoning plan (MN, R: housing and agricultural). Utilities available: electricity, sewage, gas, fibre. Access by asphalt road, frontage about 60 m. The plot can be divided.
Description generated from the listing data. Original in Polish.
Plot details
Zoning and building we checked this for you
Utilities and access we checked this for you
Legal status
Identity confirmed through the seller's bank (mojeID) and matched with the land register. Checked on .
Hazards and restrictions
Check the flood hazard map (map layer).
A building usually has to stand at least 12 m from the forest edge. On a narrow plot this can limit building.
Example. In the full version every plot is checked automatically against the maps of Wody Polskie, the Polish Geological Institute, GDOŚ and the heritage register. Information from public maps, not a guarantee.
What next with this plot?
Goal: Family house · 2 to check, 0 need attention, 5 done
Before you buy
- Check the land registerDone
We checked this for you: the owner matches the register.
- Check what you may buildDone
We checked this for you: zoning plan MN, R.
- Check access to a public roadDone
Public road, asphalt.
- 4Check hazards and restrictionsCheck first
Applies to this plot: water in the area, forest next to the plot.
See on the map whether the plot is in a zone. Each restriction is explained in the box “Hazards and restrictions”.
Free, you can check it online yourself
Where to check:Wody Polskie flood portalsite in Polish - 5Soil surveyTo do
Boreholes show if the ground is stable and how deep the water is. Foundation costs depend on it.
Paid and optional. Worth doing before signing, especially for a pricier plot
- 6Sign the deed at a notaryTo do
First a preliminary contract with conditions (e.g. getting WZ), then the notarial deed. See the cost calculator.
Useful:
Design and permits
- 7Construction mortgageTo do
The bank pays out in stages as the build progresses.
Useful: - 8Survey map for the designTo do
A surveyor prepares an up-to-date map with utilities. The architect draws the house on it.
- 9House designTo do
A catalogue design adapted to the plot, or a bespoke one.
Utilities
- ElectricityDone
Already connected on the plot.
- 11WaterCheck first
Network nearby (80 m). Ask about cost and time of a longer connection.
Useful: - SewageDone
Already connected on the plot.
- 13HeatingTo do
Gas in the road: apply to the gas operator.
Design and permits
- 14Building permit or notificationTo do
A house up to 70 m² footprint needs only a notification; a larger one needs a permit. The office has 65 days.
Construction
- 15ShellTo do
Electronic site log, site manager, foundations, walls, roof.
- 16Installations and finishingTo do
Windows, installations, heat pump or boiler, solar panels, plaster, floors.
- 17Fence, driveway, gardenTo do
Completion
- 18CompletionTo do
Notice of completion, utility acceptance, a street number, and registering the building.
Draft to be reviewed by an architect and a lawyer. Costs and times are approximate.
Location
The pin shows the approximate location of this sample listing.
Similar plots nearby
Illustrative photo
Illustrative photo
Illustrative photo