


Mixed-use plot 1,850 m², Chełm
Can I buy this plot?
Description
Mixed land in Chełm, Chełm municipality, lubelskie province. A decision on building conditions has been issued. Utilities available: electricity, water, gas, fibre. Access by asphalt road, frontage about 36 m.
Description generated from the listing data. Original in Polish.
Plot details
Zoning and building we checked this for you
A decision on building conditions has been issued: <b>housing</b>. It can be transferred to the buyer.
Utilities and access we checked this for you
Legal status
Identity confirmed through the seller's bank (mojeID) and matched with the land register. Checked on .
Hazards and restrictions
We see no restrictions in this plot's sample data.
Example. In the full version every plot is checked automatically against the maps of Wody Polskie, the Polish Geological Institute, GDOŚ and the heritage register. Information from public maps, not a guarantee.
What next with this plot?
Goal: Family house · 1 to check, 1 need attention, 4 done
Before you buy
- Check the land registerDone
We checked this for you: the owner matches the register.
- 2Check what you may buildCheck first
Building conditions exist. Check they are valid and can be transferred to you.
An extract from the local zoning plan at the council office: what, how high and how much you may build.
A small fee at the council, or ask the seller
Where to check: - Check access to a public roadDone
Public road, asphalt.
- 4Soil surveyTo do
Boreholes show if the ground is stable and how deep the water is. Foundation costs depend on it.
Paid and optional. Worth doing before signing, especially for a pricier plot
- 5Sign the deed at a notaryTo do
First a preliminary contract with conditions (e.g. getting WZ), then the notarial deed. See the cost calculator.
Useful:
Design and permits
- 6Construction mortgageTo do
The bank pays out in stages as the build progresses.
Useful: - 7Survey map for the designTo do
A surveyor prepares an up-to-date map with utilities. The architect draws the house on it.
- 8House designTo do
A catalogue design adapted to the plot, or a bespoke one.
Utilities
- 9ElectricityTo do
Power in the road: apply to the grid operator.
Useful:Usually in this region: PGE Dystrybucja. You can apply for connection conditions online on the operator's website. PGE Dystrybucja
- WaterDone
Already connected on the plot.
- 11SewageAttention
No sewer: a septic tank or small treatment plant.
Useful: - HeatingDone
Already connected on the plot.
Design and permits
- 13Building permit or notificationTo do
A house up to 70 m² footprint needs only a notification; a larger one needs a permit. The office has 65 days.
Construction
- 14ShellTo do
Electronic site log, site manager, foundations, walls, roof.
- 15Installations and finishingTo do
Windows, installations, heat pump or boiler, solar panels, plaster, floors.
- 16Fence, driveway, gardenTo do
Completion
- 17CompletionTo do
Notice of completion, utility acceptance, a street number, and registering the building.
Draft to be reviewed by an architect and a lawyer. Costs and times are approximate.
Location
The pin shows the approximate location of this sample listing.
Similar plots nearby
Illustrative photo
Illustrative photo
Illustrative photo