


Building plot 630 m², Rumia
Can I buy this plot?
Description
Building land in Rumia, Rumia municipality, pomorskie province. Covered by a local zoning plan (MN/U: housing and services). Utilities available: water, gas, fibre. Access by paved road, frontage about 15 m.
Description generated from the listing data. Original in Polish.
Plot details
Zoning and building seller's declaration
Utilities and access seller's declaration
Legal status
This plot has no land register entry. Ask for the notarial deed or a land registry extract.
Hazards and restrictions
We see no restrictions in this plot's sample data.
Example. In the full version every plot is checked automatically against the maps of Wody Polskie, the Polish Geological Institute, GDOŚ and the heritage register. Information from public maps, not a guarantee.
What next with this plot?
Goal: Family house · 3 to check, 1 need attention, 2 done
Before you buy
- 1Check the land registerAttention
The plot has no land register entry. The notary will create one, but it takes longer.
Who owns it, any mortgages, rights of way or claims.
Free, you can check it online yourself
Where to check:Land register searchsite in PolishEnter the register number from the listing. Mortgages are in section IV, rights of way and restrictions in section III.
- 2Check what you may buildCheck first
The seller states zoning MN/U. Confirm with an extract from the council.
An extract from the local zoning plan at the council office: what, how high and how much you may build.
A small fee at the council, or ask the seller
Where to check: - Check access to a public roadDone
Public road, paved.
- 4Soil surveyTo do
Boreholes show if the ground is stable and how deep the water is. Foundation costs depend on it.
Paid and optional. Worth doing before signing, especially for a pricier plot
- 5Sign the deed at a notaryTo do
First a preliminary contract with conditions (e.g. getting WZ), then the notarial deed. See the cost calculator.
Useful:
Design and permits
- 6Construction mortgageTo do
The bank pays out in stages as the build progresses.
Useful: - 7Survey map for the designTo do
A surveyor prepares an up-to-date map with utilities. The architect draws the house on it.
- 8House designTo do
A catalogue design adapted to the plot, or a bespoke one.
Utilities
- 9ElectricityCheck first
Network nearby (300 m). Ask about cost and time of a longer connection.
Useful:Usually in this region: Energa Operator. You can apply for connection conditions online on the operator's website. Energa Operator
- WaterDone
Already connected on the plot.
- 11SewageCheck first
Network nearby (80 m). Ask about cost and time of a longer connection.
Useful: - 12HeatingTo do
Gas in the road: apply to the gas operator.
Design and permits
- 13Building permit or notificationTo do
A house up to 70 m² footprint needs only a notification; a larger one needs a permit. The office has 65 days.
Construction
- 14ShellTo do
Electronic site log, site manager, foundations, walls, roof.
- 15Installations and finishingTo do
Windows, installations, heat pump or boiler, solar panels, plaster, floors.
- 16Fence, driveway, gardenTo do
Completion
- 17CompletionTo do
Notice of completion, utility acceptance, a street number, and registering the building.
Draft to be reviewed by an architect and a lawyer. Costs and times are approximate.
Location
The pin shows the approximate location of this sample listing.
Similar plots nearby
Illustrative photo
Illustrative photo
Illustrative photo