


Building plot 820 m², Żukowo
Can I buy this plot?
Description
Building land in Żukowo, Żukowo municipality, pomorskie province. Covered by a local zoning plan (MN: single-family housing). Utilities available: electricity, fibre. Access by paved road, frontage about 35 m.
Description generated from the listing data. Original in Polish.
Plot details
Zoning and building seller's declaration
Utilities and access seller's declaration
Legal status
The plot has a land register entry. Ask the seller for its number and check it for free in the national EKW system.
Hazards and restrictions
We see no restrictions in this plot's sample data.
Example. In the full version every plot is checked automatically against the maps of Wody Polskie, the Polish Geological Institute, GDOŚ and the heritage register. Information from public maps, not a guarantee.
What next with this plot?
Goal: Family house · 4 to check, 0 need attention, 2 done
Before you buy
- 1Check the land registerCheck first
The owner is not verified yet. Check the register before paying a deposit.
Who owns it, any mortgages, rights of way or claims.
Free, you can check it online yourself
Where to check:Land register searchsite in PolishEnter the register number from the listing. Mortgages are in section IV, rights of way and restrictions in section III.
- 2Check what you may buildCheck first
The seller states zoning MN. Confirm with an extract from the council.
An extract from the local zoning plan at the council office: what, how high and how much you may build.
A small fee at the council, or ask the seller
Where to check: - Check access to a public roadDone
Public road, paved.
- 4Soil surveyTo do
Boreholes show if the ground is stable and how deep the water is. Foundation costs depend on it.
Paid and optional. Worth doing before signing, especially for a pricier plot
- 5Sign the deed at a notaryTo do
First a preliminary contract with conditions (e.g. getting WZ), then the notarial deed. See the cost calculator.
Useful:
Design and permits
- 6Construction mortgageTo do
The bank pays out in stages as the build progresses.
Useful: - 7Survey map for the designTo do
A surveyor prepares an up-to-date map with utilities. The architect draws the house on it.
- 8House designTo do
A catalogue design adapted to the plot, or a bespoke one.
Utilities
- ElectricityDone
Already connected on the plot.
- 10WaterCheck first
Network nearby (120 m). Ask about cost and time of a longer connection.
Useful: - 11SewageCheck first
Network nearby (300 m). Ask about cost and time of a longer connection.
Useful: - 12HeatingTo do
No gas: usually a heat pump, often with solar panels.
Design and permits
- 13Building permit or notificationTo do
A house up to 70 m² footprint needs only a notification; a larger one needs a permit. The office has 65 days.
Construction
- 14ShellTo do
Electronic site log, site manager, foundations, walls, roof.
- 15Installations and finishingTo do
Windows, installations, heat pump or boiler, solar panels, plaster, floors.
- 16Fence, driveway, gardenTo do
Completion
- 17CompletionTo do
Notice of completion, utility acceptance, a street number, and registering the building.
Draft to be reviewed by an architect and a lawyer. Costs and times are approximate.
Location
The pin shows the approximate location of this sample listing.
Similar plots nearby
Illustrative photo
Illustrative photo
Illustrative photo