Building plot 1,070 m², Serock
Can I buy this plot?
Description
Building land in Serock, Serock municipality, mazowieckie province. The area is close to a lake. A decision on building conditions has been issued. Utilities available: electricity, water, sewage, gas, fibre. Access by asphalt road, frontage about 21 m.
Description generated from the listing data. Original in Polish.
Plot details
Zoning and building we checked this for you
A decision on building conditions has been issued: <b>housing</b>. It can be transferred to the buyer.
Utilities and access we checked this for you
Legal status
Identity confirmed through the seller's bank (mojeID) and matched with the land register. Checked on .
Hazards and restrictions
Check the flood hazard map (map layer).
Example. In the full version every plot is checked automatically against the maps of Wody Polskie, the Polish Geological Institute, GDOŚ and the heritage register. Information from public maps, not a guarantee.
What next with this plot?
Goal: Family house · 2 to check, 0 need attention, 4 done
Before you buy
- Check the land registerDone
We checked this for you: the owner matches the register.
- 2Check what you may buildCheck first
Building conditions exist. Check they are valid and can be transferred to you.
An extract from the local zoning plan at the council office: what, how high and how much you may build.
A small fee at the council, or ask the seller
Where to check: - Check access to a public roadDone
Public road, asphalt.
- 4Check hazards and restrictionsCheck first
Applies to this plot: water in the area.
See on the map whether the plot is in a zone. Each restriction is explained in the box “Hazards and restrictions”.
Free, you can check it online yourself
Where to check:Wody Polskie flood portalsite in Polish - 5Soil surveyTo do
Boreholes show if the ground is stable and how deep the water is. Foundation costs depend on it.
Paid and optional. Worth doing before signing, especially for a pricier plot
- 6Sign the deed at a notaryTo do
First a preliminary contract with conditions (e.g. getting WZ), then the notarial deed. See the cost calculator.
Useful:
Design and permits
- 7Construction mortgageTo do
The bank pays out in stages as the build progresses.
Useful: - 8Survey map for the designTo do
A surveyor prepares an up-to-date map with utilities. The architect draws the house on it.
- 9House designTo do
A catalogue design adapted to the plot, or a bespoke one.
Utilities
- 10ElectricityTo do
Power in the road: apply to the grid operator.
Useful:Usually in this region: PGE Dystrybucja (w Warszawie Stoen Operator). You can apply for connection conditions online on the operator's website. PGE Dystrybucja
- WaterDone
Already connected on the plot.
- 12SewageTo do
Sewer in the road: apply for a connection.
Useful: - HeatingDone
Already connected on the plot.
Design and permits
- 14Building permit or notificationTo do
A house up to 70 m² footprint needs only a notification; a larger one needs a permit. The office has 65 days.
Construction
- 15ShellTo do
Electronic site log, site manager, foundations, walls, roof.
- 16Installations and finishingTo do
Windows, installations, heat pump or boiler, solar panels, plaster, floors.
- 17Fence, driveway, gardenTo do
Completion
- 18CompletionTo do
Notice of completion, utility acceptance, a street number, and registering the building.
Draft to be reviewed by an architect and a lawyer. Costs and times are approximate.